The last time I checked, there was a Design Change Request ( DCR) in with the HA development team to overcome this issue. 我上次检查时,有一个DesignChangeRequest(DCR)请求HA开发团队解决这个问题。
In this case, the RSW manufacturer endured a lengthy ( hence costly) root-cause analysis that eventually required a design change. 在这种情况下,RSW制造商必须忍受漫长的(因此是代价高昂的)根源分析过程,并最终改变设计。
A more realistic scenario is that a new requirement is introduced to a project that requires a design change. 还有一种现实一些的情况是项目中加入了新的需求,需要对设计进行修改。
Sometimes we tag defects as "works as designed" or "no plans to fix" because the application is actually working as it was designed, and it would be too costly or risky to make the design change. 有时候我们把缺陷标志成为“伴随设计更正”或者“不计划修复”,因为应用程序实际上是伴随着设计工作的,更改设计将是过于昂贵和具有风险的。
The following abilities are affected by the design change: Sinister Strike, Ambush, Backstab, Whirlwind, Mortal Strike, and Overpower. 我们改变了使用瞬发攻击技能时的攻击强度的计算方法。
On the Possible Designing Problem from Shen-zhang Highway Design Change 由沈彰高速公路设计变更谈设计中易出现的问题
Modify design must have a design department issued by the design change. 修改设计必须要有设计部门签发的设计变更。
Prepare quality plan and inspection sheet for new project or design change. 制定新产品或设计更改的产品的质量控制计划。
This paper narrates solutions to the edge coverage problem of powder coatings from three aspects of outward design change, spraying technology improvement and formula modification. 从改变被涂物外观设计、改进喷涂工艺和调整粉末涂料配方设计三方面着手阐述了粉末涂膜边角覆盖问题的解决方法。
Research on Conceptual Design Change Management in Product Design Chain 产品设计链中概念设计变更管理研究
Have high severity numbers been revised when a design change was completed? 在设计更改完成后有没有将高烈度数修正?
Application of Kendall Ranks Law in Design Change Information Analysis for Aviation Product 设计更改统计分析在航空产品设计质量过程管理中的应用
The chaos theory explores how to create order in chaos, design change in order, and find opportunity in the process of change. 混沌理论探索如何在混沌中创造秩序,在秩序中设计变革,并在变革中寻找机遇。
So if an engineer proposes a certain design change it cannot be included in the plant design until this committee, and a whole bunch of other people, review and approve it. 如果一个工程师建议要改变设计,那不能被包括在电站设计内,直到委员会,全部的其他人,都评价并通过那个改变。
Product design change review and implement. 产品设计变更之审查、执行。
We first caught wind of this design change when a screenshot of the new IE9 leaked onto the web. 我们第一次注意到这一设计风格的转变还要归功于早前网络上流传的一张IE9泄露截图。
Cost Control of Design Change in Highway Tunnel Engineering 公路隧道工程设计变更中的工程造价控制
Publishes the design change written notice, renewal blueprint. 出设计更改通知书,更新图纸。
Major design change data of pressure parts; 受压元件重大设计更改资料;
But as our expectations of design change, so do those qualities and the relationship between them. 但随着人们对设计期望发生改变,这些特点及它们之间的关系也改变了。
Any design change or engineering change of the contracted products will result in a disposal plan of the existing finished goods stock. The position requires supplier research and will involve in traveling to factories within China. 供方或需方需要对本协议涉及的产品作设计或工程更改时,需协商处理已有的成品库存。此协调人需要在国内经常出差并进行供应商调研。
Issues related to change of design are discussed in terms of procedure and principle of design change. 通过对变更设计的程序和原则进行的分析,阐述了变更设计涉及的几个主要问题。
A: How do we decide if we need to implement a design change? 我们怎么确认是否要进行设计更改?
Research and Application of Discrete Product Design Change 离散产品设计变更管理的理论研究与应用
Plan change would arouse design change, construction methods change and new augmentation of works. 新增工程的生成则可能导致计划变更的产生。建设项目工程变更样本统计学分析结果表明,设计变更和施工措施变更是建设项目工程变更的主要形式,是控制的重要对象。
Advanced techniques and methods are influencing and promoting the design change of underground engineering. 先进的施工技术和方法正在影响和促进隧道和地下工程设计思路的转变。
Design change control system based on process control 基于过程控制的设计更改控制系统研究
The employer should reduce the amount of design change to avoid claim and argument. 工程业主应尽量减少设计变更,以避免索赔和纠纷;
With the time to go on to require changes in logo design change with the times. 随着时代的不断前行,要求标志设计随着时代的变化而改变。
Furthermore the project schedule management process, project quality management process, design change management process and project negotiation management process were made according to the situation of Yongxin international plaza. 并根据永新国际广场的情况编制了工程进度管理流程、工程质量管理流程、设计变更管理流程和工程洽商管理流程。